AVS-elli – Hostile Vehicle Mitigation | Data Destruction Equipment Manufacturers

HESCO flood barrier being filled

AVS-elli nominated as HESCO’s Australian Agent for HESCO Flood Mitigation products

FLOODLINE is ideal for emergency flood response, offering significant advantages over traditional sandbags, in terms of cost, time and labor requirement for installation.

A wall using HESCO earth-filled barrier can be filled by two people and a standard front-end loader in just 20 minutes. The equivalent sized wall of 1,500 sandbags can take 10 people up to 7 hours to fill and build.

The unique design, strength and versatility of the unit means that corners can be constructed easily, shaping the protective storm barrier to its surrounding landscape.

For further information, go to the AVS-elli Flood Mitigation page.